| CONTENTS
|
Hot House
Winter
Wire-land
Code Basics
What's
Wrong
Here?
Code Q&A
Code Quiz
Faces of the Code
Whose
Code
Is It?
EC&M Code Conferences
|
|
About this Newsletter
|
This twice-a-month e-newsletter is brought to you from the
publisher of EC&M magazine. CodeWatch will:
Let you know what could be changing in the Code®.
Help you brush up on your ability to apply the Code®.
Test your knowledge of the Code® with a Q&A format.
Introduce you to the people who vote on the rule changes.
Provide information on upcoming Code® seminars and shows.
Give you an opportunity to sound off on Code®-related issues.
We want to make sure we're providing you with the content you need to
better manage your business or enhance your technical skills. E-mail us and
let us know what you want to see in future issues of this e-newsletter.
We will do our best to address your request in a future issue of
CodeWatch.
|
Subscriptions
|
|
To sign up
for your free subscription, click here: Subscribe
To unsubscribe from this newsletter click here: Unsubscribe
To get this newsletter in a different format (Text, AOL or HTML),
or to change your e-mail address, please visit your profile page to change your delivery
preferences.
|
Back Issues
|
|
Missed an
issue? Visit the
CodeWatch archive on EC&M's Web site.
|
Tell a friend about CodeWatch
|
|
Do you know
of someone who'd like to receive CodeWatch? Visit the subscriber site, enter their e-mail
address and spread the wealth!
|
Advertising
|
To find out
how to advertise in this newsletter, e-mail Bob MacArthur or call
him at (913) 967-1837.
The designations "National Electrical Code" and "NEC" refer to the
National Electrical Code®, which is a registered trademark of the
National Fire Protection Association.
|
| | | | |
|
Nightmare Installations
Hot House
After finding exposed wiring in the basement of a
residential single family home where I was changing out the electrical
service, I knew the job was going to call for some major rework. The
problems started when I was outside drilling a hole through the metal
siding. I got a tingle, so I took a voltage meter and measured 120V
from
the siding to ground. After a quick walk around the house I determined
that the siding was isolated from ground, which prevented the
overcurrent devices from tripping. I proceeded to the service to check
out home runs. Sure enough, the equipment ground for an NMC cable
branch
circuit had been cut off. I traced it to the attic space that had been
finished off by the previous owner. There on an outside wall in a crawl
space was a horribly overfilled junction box. The installer had screwed
the junction box to the ship lap (0.75-inch solid wood sheathing), and
the screw went through the ship lap and into the exterior metal siding.
Of course after he repeatedly got a short circuit trying to energize
the
circuit, his solution was to cut the ground wire. The new owners were
shocked to hear that they had an electrified house. This is a good
example of why metal siding on structures should be grounded.
Pete Schissel
Mendota Heights, Minn.
ADVERTISEMENT
FlukePlus: Membership Rewards You With Benefits
You
Can Use and It's Free!
Join FlukePlus, the industry's first on-line program for professional
test
tool users www.fluke.com/plus5
Winter Wire-land
I received a call from the plant manager of a steel
fabricating company who claimed his lighting panel was quite warm -- in
the middle of winter in northern Ohio. I went to the plant, and when I
opened the panel I discovered that there was only one neutral for three
groups of 3-phase runs. In other words, nine circuits were sharing one
neutral. That one wire was generating enough heat to keep the enclosure
warm to the touch despite an ambient temperature of 30°F. I
replaced
all of the conductors for the nine circuits because of the likelihood
that the insulation of the wire in close proximity was compromised.
And,
of course, I added neutral conductors.
PJ Tiber
Burton, Ohio
Send your 200-word story to us and it may
appear in a future issue of CodeWatch. Authors of stories chosen for
publication will receive $25.
ADVERTISEMENT
Ultraweld Exothermic Connections - New 2004
Catalog
Harger proudly introduces our NEW 2004 ULTRAWELD Exothermic Connections
Catalog, which represents a compilation of exothermic welding products
for electric utility, telecommunications, and commercial & industrial
grounding. The catalog includes the latest innovations in mold design
to
provide greater cost effectiveness and ease of use. The catalog is
available in paper or on a CD-ROM. For a FREE catalog, contact us at
800-842-7437 or our web-site, www.harger.com.
Applications Corner
Code Basics
By Mike Eby
Anyone who has worked on energized electrical equipment
should be familiar with an electrical work permit. If you're working on
an energized system without a permit, it's only a matter of time before
you're injured, or worse yet, exposed to a lethal shock.
Art. 130 of NFPA 70E, Standard for Electrical Safety in the
Workplace, outlines the requirements you must follow when working
on
or near electrical parts operating at more than 50V. Work to be
performed on an energized system may be done only after completion of a
written work permit. Per 130.1(A)(2), the electrical work permit shall
include, but not be limited to, the following:
A description of the circuit and equipment to be worked on and
their location
Justification for why the work must be performed in an
energized condition
A description of the safe work practices to be employed
Results of the shock hazard analysis
Determination of shock protection boundaries
Results of the flash hazard analysis
The flash protection boundary
The necessary personal protective equipment to safely perform
the assigned task
Means employed to restrict the access of unqualified persons
from the work area
Evidence of completion of a job briefing, including a
discussion of any job-specific hazards
Energized work approval (authorizing or responsible
management, safety officer, or owner, etc.) signature(s)
There is an exemption clause that allows qualified persons to forego
an electrical permit when testing, troubleshooting, or taking
measurements, provided you follow safe work practices and use personal
protective equipment in accordance with requirements noted in Chapter 1
of this standard. You can also forego the permit if the employer can
demonstrate that de-energizing the parts introduces additional or
increased hazards, or isn't feasible due to design or operation
limitations.
ADVERTISEMENT
UL Listed ETP Raintight Fittings Have Inspection Aid
ETP UL Listed Raintight EMT steel couplings and connectors feature
exclusive InspectoRidge External Inspection Aid for faster
identification by inspectors. Formed on the outside of the coupling or
connector, it allows an inspector to visually determine that the
fitting
is raintight. Offered in 1/2-inch to 1-inch trade sizes, the fittings
have an internal sealing ring and gasket, along with a KO sealing ring.
Choose from insulated or non-insulated throat. The rugged steel
construction has a zinc electroplate finish. The fittings install with
standard electrician tools and methods.
For information, call 800-621-1506. E-mail: literature@egseg.com
Code Challenge
What's Wrong Here?
By Joe Tedesco
How does this
installation violate NEC requirements?
Hint: This is a "hot" receptacle in more ways than one.
Code Q&A
By Mike Holt
Q. Does the Code permit installation of
nonmetallic-sheathed cable in a three-story hotel building?
See the answer.
Code Quiz
By Steven Owen
According to the 2005 NEC, when is a listed AFCI
breaker
not required, even though AFCI protection is still required for
dwelling
unit bedroom outlets?
- when an AFCI is installed within 6 feet of the
branch-circuit overcurrent device as measured along the branch-circuit
conductors
- when the circuit conductors between the branch-circuit overcurrent
device and the AFCI are installed in a metal raceway or a cable with a
metallic sheath
- a and b
- never
Visit EC&M's Web
site
for the answer and explanation.
ADVERTISEMENT
Cool Electronic Cabinets
Low cost Cabinet Coolers stop electronic control downtime due to heat,
dirt and moisture. UL Listed Cabinet Coolers produce 20 degree
Fahrenheit air from an ordinary supply of compressed air to cool
electrical controls. Thermostat control minimizes air usage. Maintains
the NEMA 4, 4X (stainless steel) and 12 rating of the enclosure. Web
site offers detailed information, downloadable drawings and PDF
literature.
www.exair.com
Faces of the Code
Elio
Checca Member, Code-Making Panel 5
Before Elio Checca was even born, the mines that had
been active during the height of WWII in his hometown near Bridgeville,
Pa., had already shut down. So even though they created the backdrop
for
his childhood, it wasn't until he took a job at the Pittsburgh branch
of
the Mine Safety and Health Administration (MSHA) in 1980 that he
actually stepped into one. Since then, it has been his job to make sure
the constantly expanding electrical systems that bring ore to the
surface are safe. "As you mine, you have to progress farther into the
mine, and you have to keep stretching the power system," he says.
"Nothing in an underground mine is stationary."
That constant movement puts stress on power cables and can create the
possibility of shock or electrocution, making grounding a key concern
for Checca and MSHA. Although the NEC doesn't cover underground mines
(they have their own strict regulations), its requirements are still
important to surface mining. While chairing an MSHA committee that
considered incorporating the NEC's grounding requirements into its own
regulations, Checca became a member of Code-Making Panel 5. The
committee ultimately decided not to adopt Art. 250 and make it a
requirement, but the NEC guidelines are still one way of complying
with
the grounding performance standards in Title 30 of the Code of Federal
Regulations for non-coal mines.
Being able to rely on the Code is crucial, Checca says, because in many
cases electricians who work in mines may not know all of MSHA's rules.
"[A small mine] will typically have to go into town and hire a local
electrician if they have a problem, and in my experience, they're not
usually familiar with MSHA regs, but they're very familiar with the
Code," he says. "That's just another way the NEC provides so many
safeguards to people."
Since leaving his native Pennsylvania and becoming
assistant to the director of technical support at MSHA's national
office
in Arlington, Va., Checca no longer works out in the field,
investigating accidents or power systems problems himself, but he's no
less concerned about mine electrical safety. In fact, in the time that
he has been there, annual mine electrocutions have dropped by more than
80%. "The mining industry has
made great strides in reducing electrical accidents by using the NEC for
the design of their electrical systems," he says.
ADVERTISEMENT
Drives, Starters, and Contactors Direct!
Cerus supplies top quality contactors, starters, and variable frequency
drives. Contactors are backed by industry first 5 year warranty.
Variable speed drives from 1/2 to 300 Hp featuring Space Vector PWM for
long motor life. Get all the facts. See http://www.cerusind.com or call
1-800-962-3787 for a FREE catalog.
Speak Out
Whose Code Is It?
The NEC doesn't include requirements for underground
mining operations, instead leaving that responsibility up to MSHA and
the Code of Federal Regulations. On the other hand, in most cases,
NEC-compliant
installations are adequate for passing MSHA's performance standards for
surface mines.
Should industries defer to the Code even if it doesn't include rules
specific to their needs? Visit www.ecmweb.com to tell us.
Whether it has hurt business for electrical workers by eliminating
the need for cabled connections or made it easier by providing portable
means of communication like cell phones and PDAs, it's obvious from
CodeWatch readers' responses that the wireless technology explosion has
had a marked effect on the electrical industry. Kind of ironic when you
consider wiring is the backbone of the business.
ADVERTISEMENT
www.NECcode.com
The National Electrical Code Internet Connection, the No. 1
rated Code Web site in the world, offers the following FREE products:
Books, Code Quiz, DVDs, Graphics for PowerPoint, Newsletter, Online
Training, Posters, Simulated Exams, Software, Video clips, and Videos
Visit www.NECcode.com and stay
current with important industry issues.
Shows and Events
EC&M Code
Conferences
After some serious negotiating and good old
arm-twisting, we've convinced our conference manager to give us one
final extension on the registration deadlines for each of these
training
sessions. The new deadline for the Atlanta conference is Oct. 26th. The
new deadline for the Philadelphia, Chicago, and Orlando Code Change
conferences is Oct. 30th. The new deadline for the Boston conference is
Nov. 19th. And the new deadline for the San Francisco and Seattle
conferences is Nov. 24th. Download
the registration form, fill it out and fax it to (203) 929-5351 before
it's too late. Moderated by Mike Holt and Fred Hartwell (Boston
conference only), the two-day conferences will offer a comprehensive
look at the 2005 Code. All attendees will receive a copy of the 2005
NEC
and EC&M's 2005 Code Change Book, written by Mike Holt.
|
|
You are subscribed to this newsletter as <*email*>
For questions concerning delivery of this
newsletter, please contact our Customer Service Department at:
US Toll Free: (866) 505-7173
International: (402) 505-7173
or custserv@newsletter.primediabusiness.com
Primedia Business Magazines & Media
9800 Metcalf Avenue
Overland Park, KS 66212
Copyright 2004, PRIMEDIA. All rights reserved. This article is
protected
by United States copyright and other intellectual property laws and may
not be reproduced, rewritten, distributed, re-disseminated,
transmitted,
displayed, published or broadcast, directly or indirectly, in any
medium
without the prior written permission of Primedia Business Magazines &
Media Inc.
|
|